Fees for the design |
|
|
|
Original Prices according to the price-list, 1 USD = 36 rubles. At a large amount of work provided for adjustment, lowering rates. Name Description Price with VAT cu Note HEATING (internal network) Hydraulic calculation of the heating system M2 0,36 Executive scheme of the heating system m2 of 1,50 Obmerochny plan m2 from 1,25 Scheme binding heating installations, taking into account the scheme of power equipment 65 depending on the number of units Calculation of heat losses buildings m2 0,75 Specifications for the line heating M2 0,25 Specification of equipment installation of the heating circuit of 6 The scheme razvodki sitemy heating floor plans m2 0,25 Scheme of the heating system (line), showing the settings termostaticheskoy fixtures m2 0,15 The scheme of power supply equipment of heating installation 45 Heat FLOOR Gidavlichesky account warm sex m2 1,00 Executive scheme Heat sex m2 1,50 Specification section warm floor m2 0,18 The scheme razvodki systems warm the floor to floor plans m2 1,50 The scheme of warm sex (line), showing the settings termostaticheskoy fixtures m2 0,50 The water supply system (internal network) The hydraulic calculation of water supply systems unit 4,00 Executive scheme of water supply unit 5,00 Specifications for the water project site 2,00 The scheme razvodki water supply system in the floor plans site 4,00 The scheme of water supply system in aksonometrii site 4,00 Sewerage system (internal network) Hydraulic calculation of a sewage system node 4,00 Executive sewerage scheme knot 5,00 Specifications for the sewer line unit 2,00 The scheme razvodki sewerage system at floor plans knot 4,00 The scheme of a sewage system in aksonometrii site 4,00 VENTILATION PRINUDITELNAYA (internal network) Executive scheme ventilation m2 0,60 The calculation of the ventilation system M2 1,25 Specification section ventilation M2 0,75 The scheme razvodki the ventilation system in the floor plans M2 0,3 The scheme of the ventilation system in aksonometrii m2 0,60 KONDITSIONIROVANIE Executive scheme conditioning system M2 0,60 The calculation of air conditioning m2 0,75 Specifications for the project conditioning M2 0,75 The scheme razvodki sitemy conditioning to floor plans M2 0,3 Arrangement of air conditioning in aksonometrii M2 0,3 HEATING (external network) Executive scheme heating 1,00 m Plan and profile of heating m 3 Calculation of heating 1,00 m Specifications for the line heating 0,75 m VODOPROVOD (external network) Executive scheme aqueduct 0,8 m Plan and profile of the aqueduct m 3 The calculation of the aqueduct 1,00 m Specifications for water-supply line 0,75 m Sewerage (external network) Executive scheme stormwater drainage m 1 Executive scheme of treatment facilities to 10 m3/sut to-125 with household Executive scheme domestic sewage 1,00 m Plan and profile of stormwater drainage m 3 Plan and profile of VOCs to-125 with everyday Plan and profile of domestic sewage m 3 The calculation of storm sewer 1,00 m The calculation of the local wastewater treatment plants (VOC) by 10 m3/sut to-household with 15,0 The calculation of domestic sewage 1,00 m Specification section stormwater drainage 0,75 m Specification section domestic sewage 0,75 m ДРЕНАЖ and water (external network) Executive scheme of drainage and sewerage 0,8 m Plan and profile of drainage and sewerage m 3 Calculation of drainage and sewerage 1,00 m Specifications for the drainage and water line 0,75 m |
| Next > |
|---|



